, inc.
Mincey Marble Mfg., Inc.
1940 New Harvest Road
Gainesville, GA 30507
Ph: 770.532.0451
www.minceymarble.com
MATERIALS / TOOLS NEEDED CHECKLIST
PRE-INSTALLATION PIECES / PARTS LIST
ENCLOSURE SYSTEM INSTALLATION
Installation Instructions for Mincey Marble
Manufacturing’s Arezzo Bypass Barn Door Shower Enclosures
ATTENTION: Prior to starting the installation, please read through these instructions. This will
help avoid any unneccesary breakage. Any breakage due to handling or installing this enclosure
system is the responsibility of the installer and is not covered under the Mincey Warranty. The
Warranty will be voided if included hardware is not used during installation. Mincey recommends
that two people are used to install this shower enclosure system due to the weight and fragility of
the glass panels. Mincey also recommends that you protect the glass, especially the bottoms, and
the shower pan during installation. If your doors have frosted glass, the frosted side of the glass
goes to the outside of the shower.
These installation instructions apply to the Mincey Arezzo Bypass Barn Door Shower Enclosure System. In these
instructions we are going to use an example with a 60” wide shower.
All Drawings Are Not To Scale.
8QFUDWHDOORIWKHPDWHULDOVDQGFRQ¿UPWKDWDOORIWKHSDUWVDQGSLHFHVDUHSUHVHQW The Required
Tools are listed below. The contents of the Hardware Kit are listed below. The Parts Diagram is on the following
page. Before you begin the installation, make sure that all of the pertinent surfaces are clean and free of dust,
debris and any shavings. After you perform any drilling, you will want to make sure the surfaces are clean again
- this includes the Shower Pan and the Shower Panel Walls.
MATERIALS / TOOLS NEEDED
INCLUDED IN THE HARDWARE KIT
ROLLERS QTY: 4
GLASS DOOR
RETENTION
PIECES
QTY: 4
BUMPERS
QTY: 8
CENTER DOOR
GUIDE QTY: 1
END DOOR
GUIDES QTY: 2
1/8”
QTY: 2
3/16”
ALLEN
WRENCHES
WALL
ANCHORS
QTY: 8
1 1/4”
SCREWS
QTY: 8
7/16”
SCREWS
QTY: 8
BUMPER
SCREW
COVERS
QTY: 8
DRILL (CORDED OR CORDLESS),
1/4” MASONRY DRILL BIT,
5/16” MASONRY DRILL BIT,
1/8” METAL DRILL BIT
TAPE MEASURE
PENCIL
LEVEL
CAULK GUN,
100% SILICONE
RUBBER MALLET
PORTABLE BAND SAW
(PREFERRED METHOD)
HACK SAW- OR -
PHILLIPS HEAD SCREWDRIVER
LOCTITE
BLUE 243
THREADLOCKER
If you have any questions, please call MINCEY MARBLE CUSTOMER SERVICE at 770-532-0451.
Mincey Marble Mfg., Inc.
|
1940 New Harvest Road, Gainesville, GA 30507
|
770.532.0451
|
minceymarble.com
SHOWER ENCLOSURE PARTS LIST
ASSEMBLY CODE ASSEMBLY NAME QTY
1 GLASS PANEL 2
2 VERTICAL WALL CHANNELS 2
3GUIDE RAIL1
4WATER GUARD1
5TOWEL BARS2
6 ROLLERS 4
7 DOOR PANEL RETENTION PIECE 4
8 DOOR GUIDE 1
9BUMPERS8
10 BUMPER SCREW CAPS 8
11 DOOR SIDE GUIDES 2
12 7/16" PAN HEAD SCREWS 8
13 1 1/4" PAN HEAD SCREWS 8
14 WALL ANCHORS 8
PRE-INSTALLATION PIECES / PARTS LIST (cont.)
2
(1)
(2)
(3)
(4)
(6)
(6)
(7)
(8)
(9)
(5)
(10)
(11)
(5)
(2)
(1)
(7)
(9)
(9)
(9)
(10)
(10)
(10)
(11)
(14)
(14)
(14)
(14)
(14)
If you have any questions, please call MINCEY MARBLE CUSTOMER SERVICE at 770-532-0451.
Mincey Marble Mfg., Inc.
|
1940 New Harvest Road, Gainesville, GA 30507
|
770.532.0451
|
minceymarble.com
AREZZO BYPASS BARN DOOR ENCLOSURE SYSTEM INSTALLATION
3
These instructions are to be followed assuming the Shower Pan is level and the Walls are plumb. After you have
FRQ¿UPHGWKDWDOORIWKHUHPDLQLQJSDUWVDQGSLHFHVDUHSUHVHQW\RXDUHUHDG\WREHJLQE\SUHSDULQJWRLQVWDOO
WKH:$7(5*8$5'¿UVW
Start by measuring the distance between the Wall Panels just above the Shower Pan Curb, and deducting 3/16”
tolerance for the Vertical Wall Channels. Trim the WATER GUARD using the Portable Band Saw or Hack Saw.
The WATER GUARD can be trimmed from either end. Then, slide the CENTER DOOR GUIDE onto the WATER
GUARD. You will center and install the Door Guide later.
MEASURE WALL TO WALL
AT THE PAN CURB,
TRIM WATER GUARD
DEDUCTING 3/16” FOR
VERTICAL WALL CHANNEL
TOLERANCES
SLIDE THE CENTER DOOR
GUIDE INTO THE WATER
GUARD USING THE TAB ON
THE END OF THE GUIDE
CENTER LOOSELY ON WATER
GUARD, WILL INSTALL
PERMANENTLY LATER
Next, Mark and Drill the holes for the LEFT VERTICAL WALL CHANNEL making sure it is Plumb with the Level.
Also, be sure to center the VERTICAL WALL CHANNEL on the Shower Pan Curb. Clean up any debris or
shavings. Install the WALL ANCHORS in the Wall Panels in the three Top, Center and Bottom locations.
Place the WATER GUARD with CENTER DOOR GUIDE on the Top of the Curb. Install the LEFT VERTICAL WALL
CHANNEL while sliding the WATER GUARD into the slot manufactured from the factory in the Front of the
VERTICAL WALL CHANNEL.
PLUMB LEFT VERTICAL
WALL CHANNEL WITH
LEVEL, MARK LARGER HOLE
LOCATIONS AND REMOVE
SCREW
TO WALL
HOLES
HAMMER
IN ALL
THREE
ANCHORS
SCREW
IN WALL
CHANNEL
REMOVE WALL
CHANNEL, DRILL HOLES
WITH 5/16” MASONRY
BIT, HAMMER IN
WALL ANCHORS
CLEAN DEBRIS AND
SHAVINGS, PLACE WALL
CHANNEL AND SCREW
INTO PLACE
1 1/4”
PAN HEAD
SCREWS
WALL
ANCHORS
PAN
BUMPER
HOLES
SLIDE THE WATER GUARD WITH
THE CENTER DOOR GUIDE INTO
THE FACTORY SLOT IN THE FRONT
OF THE VERTICAL WALL CHANNEL
THEN INSTALL THE VERTICAL
WALL CHANNEL
If you have any questions, please call MINCEY MARBLE CUSTOMER SERVICE at 770-532-0451.
Mincey Marble Mfg., Inc.
|
1940 New Harvest Road, Gainesville, GA 30507
|
770.532.0451
|
minceymarble.com
AREZZO BYPASS BARN DOOR ENCLOSURE SYSTEM INSTALLATION (cont.)
4
For the Right VERTICAL WALL CHANNEL, follow the same instructions as in the installation of the Left VERTICAL
WALL CHANNEL.
Next, you will Center the CENTER DOOR GUIDE, and mark where to drill your holes. Slide the CENTER DOOR
GUIDE to one side out of the way. Then, drill the holes on the Shower Pan Curb using a 1/4” Masonry Drill Bit.
Clean up any debris or shavings. Fill the holes with 100% Silicone and push in the two PLASTIC ANCHORS, and
wipe up any excess Silicone. Slide the CENTER DOOR GUIDE back into position and screw into place.
SLIDE THE RIGHT VERTICAL WALL
CHANNEL WITH THE FACTORY SLOT INTO
POSITION OVER THE WATER GUARD
THEN INSTALL THE RIGHT VERTICAL WALL
CHANNEL FOLLOWING THE SAME
INSTRUCTIONS AS THE LEFT VERTICAL
WALL CHANNEL
MEASURE TO CENTER OF PAN CURB BETWEEN
THE VERTICAL WALL CHANNELS AND MARK
HOLES TO DRILL
SLIDE CENTER DOOR GUIDE OUT OF WAY, DRILL HOLES
WITH 1/4” MASONRY BIT, CLEAN DEBRIS, FILL HOLES
WITH 100% SILICONE, INSTALL PLASTIC ANCHORS
INSTALL CENTER DOOR GUIDE WITH
1 1/4” SCREWS AND SCREW CAPS
1RZ\RXFDQLQVWDOOWKH(1''225*8,'(67KH(1''225*8,'(6DUH/()7DQG5,*+7VSHFL¿F7KH6,'(
TAB is located to the Shower FRONT of the GUIDE, and is to be installed with the SIDE TAB resting against
the WATER GUARD. The END DOOR GUIDE also has a Center TAB on its backside that pushes into the Wall
Channel. Install the END DOOR GUIDE by applying 100% Silicone to its entire base and pushing the Rear
7DELQWRWKH:DOO&KDQQHODQGVHFXULQJ¿UPO\LQSODFH5HSHDWWKHSURFHVVIRUWKH(1''225*8,'(IRU
the other side.
TAB INSERTS INTO
THE NOTCH AT THE
BASE OF THE VERTICAL
WALL CHANNELS
SIDE TAB RESTS AGAINST THE
WATER GUARD, THIS END DOOR
GUIDE IS FOR THE SIDE SHOWN
IN THE GRAPHIC
SHOWER PAN
NO SCREWS REQUIRED FOR INSTALLATION, APPLY 100%
SILICONE TO ENTIRE BASE OF END DOOR GUIDE
PANEL
If you have any questions, please call MINCEY MARBLE CUSTOMER SERVICE at 770-532-0451.
Mincey Marble Mfg., Inc.
|
1940 New Harvest Road, Gainesville, GA 30507
|
770.532.0451
|
minceymarble.com
AREZZO BYPASS BARN DOOR ENCLOSURE SYSTEM INSTALLATION (cont.)
5
Now you are ready to install the BUMPERS in the Vertical Wall Channels.
There are four to each side; two at the top and two at the bottom,
secured with a single, center 7/16” Screw and Screw Cap.
Install all of the ROLLERS into the Upper Holes
in the GLASS PANELS with the CAM LOBE in
the DOWN position, this will place the
GLASS PANELS in the DOWN position
as a baseline for starting the
panel adjustments.
ADJUSTMENT
CAM LOBE
FELT WASHERS
GLASS PANEL
CAM LOBE UP = GLASS UP
CAM LOBE DOWN = GLASS DOWN
You are now ready to install the GUIDE RAIL.
Before you install the GUIDE RAIL, it is
recommended to place one of the GLASS
PANELS inside the Shower with the ROLLERS
facing outward. This will make it easier to
install the Back Glass Panel after the
GUIDE RAIL has been installed. Be
sure to protect the bottom of the
GLASS PANEL and the Shower Pan.
Next you will prepare to install the GLASS PANELS. Start by disassembling
the ROLLERS and installing them onto the GLASS PANELS.
1/8” ALLEN
WRENCH
3/16” ALLEN
WRENCH
USE ONE OF THE 1/8”
ALLEN WRENCHES TO
HOLD THE END WHEEL
ON THE ROLLER WHILE
YOU LOOSEN THE END
SCREW WITH THE 3/16”
ALLEN WRENCH
NOTE: LOCTITE BLUE 243 is required
as a threadlocker to secure the
installation of the Roller Screws.
LOCTITE is NOT provided with the doors,
but is readily available at many hardware
stores, online at mscdirect.com or through
Mincey Marble at 1-800-533-1806.
If you have any questions, please call MINCEY MARBLE CUSTOMER SERVICE at 770-532-0451.
Mincey Marble Mfg., Inc.
|
1940 New Harvest Road, Gainesville, GA 30507
|
770.532.0451
|
minceymarble.com
6
AREZZO BYPASS BARN DOOR ENCLOSURE SYSTEM INSTALLATION (cont.)
To install the GUIDE RAIL, begin by measuring between the panels right above the Vertical Wall Channels
and deduct 5/8” for the Vertical Wall Channels tolerances. Trim the GUIDE RAIL using the Portable Band Saw
RU+DFN6DZ,QVWDOOWKH*8,'(5$,/E\¿UPO\SODFLQJLQWKHIDFWRU\VORWVLQWKH:DOO&KDQQHOVZLWKWKH³8´
&KDQQHORQWRS7KH5ROOHUVZLOOJOLGHEDFNDQGIRUWKRQWKH³8´&KDQQHO
INSIDE DOOR, INSIDE TOWEL
BAR LOCATED SAME WALL
WITH SHOWER HEAD FIXTURE
MEASURE WALL TO WALL
ABOVE THE WALL CHANNELS,
TRIM GUIDE RAIL DEDUCTING
5/8” FOR VERTICAL WALL
CHANNEL TOLERANCES
TRIM ON EITHER SIDE
FIRMLY SLIDE THE
GUIDE RAIL INTO
THE FACTORY SLOTS
OF THE WALL
CHANNELS, THE
WEIGHT OF THE
GLASS PANELS
WILL HOLD THE
GUIDE RAIL FIRMLY
IN PLACE
To install the GLASS PANELS, begin with the BACK GLASS PANEL that is already placed inside the Shower.
Carefully align the bottom of the GLASS PANEL into the CENTER DOOR GUIDE located on the WATER GUARD
as you hang the ROLLERS onto the GUIDE RAIL. Make sure the ROLLERS are facing out of the Shower on the
Inside Panel.
7KHQ\RXZLOODGMXVWWKH52//(56WRDOLJQWKH,QVLGH'RRUÀXVKZLWKWKH9HUWLFDO:DOO&KDQQHO%XPSHUV
where the Shower Head is located - in this example that will be the Left Side.
CAM LOBE UP = GLASS UP
CAM LOBE DOWN = GLASS DOWN
ROTATE THE ADJUSTMENT WHEEL BY USING AN
1/8” ALLEN WRENCH TO ADJUST THE GLASS PANEL
UP OR DOWN TO MAKE SURE THE GLASS PANEL IS
FLUSH TO THE VERTICAL WALL CHANNEL AT BOTH
THE TOP AND BOTTOM BUMPER LOCATIONS
WHEN YOU HAVE REACHED THE DESIRED HEIGHT ADJUSTMENT,
HOLD THE ADJUSTMENT WHEEL TIGHTLY AND TIGHTEN
THE END SCREW SECURELY WITH THE 3/16” ALLEN WRENCH
HANG
BACK
GLASS
PANEL
ONTO
GUIDE
RAIL
SHOWER
FRONT
If you have any questions, please call MINCEY MARBLE CUSTOMER SERVICE at 770-532-0451.
Mincey Marble Mfg., Inc.
|
1940 New Harvest Road, Gainesville, GA 30507
|
770.532.0451
|
minceymarble.com
7
AREZZO BYPASS BARN DOOR ENCLOSURE SYSTEM INSTALLATION (cont.)
$IWHU\RXKDYHLQVWDOOHGWKH%DFN*ODVV3DQHODQGDGMXVWHGWKH5ROOHUVVRWKDWWKH*ODVV3DQHOFORVHVÀXVKWRWKH
Wall Channel Bumpers, you are ready to install the two RETENTION PIECES to the Back Glass Panels. Use the
two 1/8” Allen Wrenches to adjust the height of the RETENTION PIECES, much in the same way the Rollers are
adjusted. Then, use both 1/8” Allen Wrenches to securely tighten the RETENTION PIECES in place.
It is ideal to leave enough space between the RETENTION PIECES and the GUIDE RAIL to slide a Credit Card or a
Key Card in-between, to ensure secure, ease of motion.
RAISE OR LOWER
RETENTION PIECE TO
DESIRED HEIGHT
HOLD FIRMLY
AND TIGHTEN
USING BOTH
1/8” ALLEN
WRENCHES
Install the TOWEL BARS in the pre-cut holes in the GLASS PANELS.
The Inside Door, closed to the wall with the Shower Head, will have
the Towel Bar on the Inside. The FINGER PULLS will be installed on
the Outside Edges of the bars.
THANK YOU FOR USING OUR MINCEY MARBLE PRODUCT! WE APPRECIATE YOUR BUSINESS!
RUN A BEAD OF 100%
SILICONE ON THE
INSIDE AND OUTSIDE
OF THE VERTICAL
WALL CHANNELS AND
WATER GUARD, ALLOW
24 HOURS BEFORE
EXPOSING TO ANY
MOISTURE
CAM LOBE UP = PIECE DOWN
CAM LOBE DOWN = PIECE UP
RAISE RETENTION
PIECES TO WHERE A
CREDIT CARD OR A
KEY CARD WILL SLIDE
BETWEEN THE RETEN-
TION PIECE AND THE
GUIDE RAIL,
ALLOWING FOR
SECURE, SMOOTH,
GLIDING OPERATION
OF THE GLASS PANELS
You are now ready to install the FRONT GLASS PANEL. Carefully align the bottom of the GLASS PANEL into the
CENTER DOOR GUIDE located on the WATER GUARD as you hang the ROLLERS onto the GUIDE RAIL. Next,
follow the same instructions as the Back Glass Panel and adjust the height of the Glass Panel with the Rollers to
the desired position and install the Retention Pieces. Then, you can proceed to installing the TOWEL BARS.
Lastly, apply a bead of 100% SILICONE on the INSIDE where the
Water Guard meets the Pan and where the Wall Channels meet the
Panels. Repeat the same process for the OUTSIDE of the Wall
Channels and the Water Guard. Must allow the Silicone to dry
for 24 hours before any exposure to water or moisture.
USE 3/32” ALLEN
WRENCH TO
TURN
FINGER PULLS
(Qty: 2)
BAR ENDS
(Qty: 2)
ACRYLIC WASHERS
INCLUDED: 7/16” (Qty: 4)
1” (Qty: 8)
THIS IS NOT
A SET SCREW,
USE ALLEN
WRENCH TO
ROTATE
TOWEL BAR
END UNTIL
ADEQUATELY
TIGHT
ADD LOCTITE BLUE
243 TO SCREWS
FINGER PULLS INSTALL
TO THE OUTSIDE
HANG
FRONT
GLASS
PANEL,
ADJUST
HEIGHT,
INSTALL
PIECES
SHOWER
FRONT
NOTE: LOCTITE BLUE 243 is required as a
threadlocker to secure the installation of the
Retention Piece Screws. LOCTITE is NOT
provided with the doors, but is readily available at
many hardware stores, online at mscdirect.com or
through Mincey Marble at 1-800-533-1806.