FEE SCHEDULE
(1303.06)
Estimated Project Cost ......................................... $
Application Fee ................................................... $ ($25/non-refundable)
Zoning Compliance Permit and/or Site Plan Fee $ ($10 for every
$1,000.00) Inspection Fee
1
.................................................
$ (see guidelines below)
Floodplain Review
2
..................................................................
$ (see guidelines below)
Stormwater Technical Review Fee
3
..............................
$ ($25 administrative fee; $2000 deposit)
Total amount of fees payable to the Town ....... $
New Sewer Service
Sewer Utility Service Fee payable to the Harpers Ferry Water Works
$ (applicant to consult with HF-B PSD)
Sewer Utility Tap Fee payable to the HF-B PSD
$ ($350)
New Water Service payable to the Harpers Ferry Water Works
Capital Capacity Improvement Fee ...... $ (see 905.04 Rate Schedule 3)
Water Utility Tap Fee .......................... $ ($750)
If the Board of Zoning Appeals determines that a subject matter expert is required, additional fees may apply
4
. For
projects greater than $1.5 million, request Fee Schedule Addendum from Town Clerk. Zoning Compliance Permits are
valid for two years. Upon written application to the Ordinance Compliance Officer or the Mayor’s designee,
extensions for permits about to expire may be granted. There is a fee of $25.00 for each permit extension.
1
Guidelines for Inspection fees:
(A) For an application with an estimated project cost less than $500.00, the inspection fee is $25.00 per inspection (maximum three inspections);
(B) For an application with an estimated project cost from $500.00 to $2,000.00, the inspection fee is 0.05 times the estimated project cost per inspection
(maximum three inspections);
(C) For an application with an estimated project cost of over $2,000.00, the inspection fee is $100.00 per inspection (maximum three inspections);
A minimum deposit for two inspections is required at the time of application. For complex projects, additional inspections may be required, but a maximum deposit for
no more than three inspections may be required at the time of application. Inspections for compliance with the permit application are required (1) prior to all removals,
(2) prior to placement of foundation or footers, (3) when framing is completed, and (4) at project completion. Inspection fees are refunded for waived inspections.
2
Guidelines for Floodplain Review fees:
An application for proposed development determined to be occurring in an identified floodplain, floodway or other flood hazard area must be accompanied by an
additional fee based upon the estimated value of the proposed construction at the following rate:
Type of Development Fee
1 & 2 family dwelling $1.00 per $1,000.00
Accessory structures $1.00 per $1,000.00
Any other structure $1.00 per $1,000.00
Site plans, grading & filling (additional fee) $50.00 per acre or part thereof
Floodway development reviews $1.00 per $1,000.00
The Floodplain Administrator may determine a different value for the proposed construction and apply the above rates for an adjusted fee amount.
3
Stormwater Technical Review Deposit
If the cost of the technical review exceeds the initial $2,000 deposit, an additional $2,000 deposit will be required.
4
Guidelines for Deposits
(A) The Board of Zoning Appeals may require expert consultants to evaluate your application. If so, you will be informed in writing that such a deposit is
required before approval can be made.
(B) For an application within the floodplain, the Floodplain Administrator may require a deposit. If so, you will be informed in writing that such a deposit is
required before approval can be made.